Hazel Grove Sunday trains return as Bee Network trials AI traffic lights
Sunday rail services are being restored in stages across Greater Manchester, while adaptive signals are being tested at 40 locations.

Sunday trains have begun returning to Hazel Grove as part of a phased restoration across Greater Manchester, while the Bee Network is testing AI-assisted traffic signals to help buses move through congestion. The first 44 Sunday journeys were reinstated on 22 November, including services across Wigan, Bolton, Rochdale and Hazel Grove.
Transport for Greater Manchester (TfGM) said further routes, including between Clitheroe and Blackburn, are due to bring the total to 70 additional services by the end of December. The return to a normal Sunday timetable is expected by May. The changes follow a two-year dispute between Northern and the RMT union that led to 230 Sunday services being cut.
The transport updates were discussed at a Bee Network committee meeting on 26 November. The staged rail restoration and traffic-signal trial are among several changes under way across the region, alongside a continuing expansion of electric buses.
When will Sunday trains return?
The railway is due to return to normal by May, but TfGM has not set out in the information available which specific services will be restored on each date. Simon Elliott, TfGM’s Network Director for Rail, said the dispute had been resolved and conductors had agreed to include Sundays in their full working week, enabling a “truly seven-day-a-week railway”.
Where are the traffic lights being tested?
The FUSION adaptive signal system is being piloted at 40 locations across Greater Manchester. TfGM says it is intended to prioritise buses and improve traffic flow at junctions, with a projected 25 per cent improvement in traffic efficiency. The locations of the trial sites have not been announced.
TfGM also reported that 584 zero-emission buses are in service, making up 33.6 per cent of the Bee Network fleet, and that 99 services are operated entirely by electric buses. A further 163 electric buses are due to enter service before the end of 2026. The authority’s target is a fully electric bus fleet by 2030.
This report draws on information from Manchester Evening News.
Editorial checks passed Facts, figures and quotes checked against 1 source

Add Stockport Wire as a preferred source on Google



